Looks like I actually have an estimated production date of September 5 for my '04 325xi. Took a while, but I'm sure the extended wait will be worth it.
Does anyone have any experience with these dates (on the BMWUSA website)? Are they fairly accurate? How long would it normally take between starting production and actually driving the Ultimate Driving Machine (delivery to NJ)?
Thanks
Does anyone have any experience with these dates (on the BMWUSA website)? Are they fairly accurate? How long would it normally take between starting production and actually driving the Ultimate Driving Machine (delivery to NJ)?
Thanks